During February 2011 into early 2012, EPH worked with Fulton Hogan supplying various types of material in the $74m Dingley Bypass project.

Alongside supplying Trucks on hire, EPH sourced and supplied over 200,000m3 of suitable re-use material to compliment the regular material supply we loaded and carted from the Boral quarry at Lysterfield. EPH also assisted in providing extra cost savings to the project through sourcing re-use options for the excess of topsoil at the end of the project.