OUR WORK ON THE DINGLEY BYPASS

In late 2011, EPH began contract work for the now-complete $156m Dingley Bypass project. The project covered a 6.4km stretch of road linking Warrigal Road at Moorabbin and Westall Road at Dingley Village. Fulton Hogan hired a fleet of EPH trucks, enabling the transport of material between the quarry and project site. EPH was responsible for sourcing and supplying over 200,000m3 of suitable re-use material to the project. In support of supply operations, EPH was heavily involved in loading and carting re-use material from the Boral quarry at Lysterfield. EPH also assisted in providing extra cost savings to the project through sourcing re-use options for the excess of topsoil at the end of the project.