OUR WORK ON THE NAGAMBIE BYPASS

In 2010, EPH was involved in major work with AbiGroup for the 13.5km main freeway section of the $188m Nagambie Bypass. Eastern Plant Hire supplied a fleet of quality trucks and equipment sets to the project. In addition to supplying hired trucks and equipment, EPH also undertook the stripping and blending of material from the GVR quarry to meet VicRoads Type A and Type B specifications, which produced over 600,000 tonnes worth of material. In an industry first, Eastern Plant Hire purchased the only certifiable portable weighbridge available in Victoria, which allowed EPH to guarantee that every load that was loaded, weighed and delivered was done in a safe and legal manner, with not a single load leaving site overloaded.